Where should we send it?

is free. Tell us who you are and the download unlocks right away.

We use your details to send this file and, if you ticked the box, the newsletter. No sharing, no spam. See the privacy policy.

Mechanical Design Data Book: The Mechanical Engineer's Data Companion
handbookFree Download

Mechanical Design Data Book: The Mechanical Engineer’s Data Companion

Outline of a free mechanical engineering data companion in four parts and thirteen chapters: units, materials, stress, fatigue, thermodynamics, fluids, fasteners, tolerances, gears, bearings and vibration. In writing, not yet available to download.

  • 3 min read
Mechanical DesignData BookEngineering ReferenceMaterialsFastenersHandbook

Status: in writing. This page shows the planned outline so you can see what the book will cover. The manuscript is not finished and there is nothing to download yet. If you want a note when it is ready, get in touch.

A field reference of the data, formulas and standards a mechanical engineer reaches for during everyday design: units and conversions, materials, stress and deflection, thermodynamics and fluids, fasteners, tolerances, gears, bearings and vibration. Subtitle: The Mechanical Engineer’s Data Companion.

Mechanical Design Data Book cover and four-part outlineMechanical Design Data Book cover and four-part outline

The planned outline

Four parts and an appendix. The planned shape of the Mechanical Design Data Book.Four parts and an appendix. The planned shape of the Mechanical Design Data Book.
The planned shape of the book.
Thirteen chapters. The chapter index.Thirteen chapters. The chapter index.
The thirteen chapters.
Part I: fundamentals and math. Chapter by chapter, as planned.Part I: fundamentals and math. Chapter by chapter, as planned.
Part I.
Part II: materials and mechanics of solids. Chapter by chapter, as planned.Part II: materials and mechanics of solids. Chapter by chapter, as planned.
Part II.
Part III: thermodynamics and fluid mechanics. Chapter by chapter, as planned.Part III: thermodynamics and fluid mechanics. Chapter by chapter, as planned.
Part III.
Part IV: mechanical design and components. Chapter by chapter, as planned.Part IV: mechanical design and components. Chapter by chapter, as planned.
Part IV.
Appendix: practical reference tables. Quick lookups at the back.Appendix: practical reference tables. Quick lookups at the back.
The reference appendix.
Part Chapters
I. Core engineering fundamentals and math 1. Units, constants and conversion factors. 2. Essential engineering mathematics: geometry, trigonometry, calculus quick reference, statistics and tolerance stack-up. 3. Statics and dynamics data: forces and moments, centroids, kinematics, Newton’s laws and energy.
II. Materials and mechanics of solids 4. Standard material properties: steels, aluminium and copper alloys, plastics, composites and ceramics. 5. Stress, strain and deformation: basic formulas, standard beam deflections, thin-walled pressure vessels, stress concentration factors. 6. Fatigue and failure: S-N data and endurance limits, von Mises and Tresca, bolted joint preload and thread engagement.
III. Thermodynamics and fluid mechanics 7. Thermodynamic data and cycles: specific heats, gas laws, abridged steam tables, Carnot, Rankine and Otto efficiencies. 8. Heat transfer: conduction, convection and radiation data. 9. Practical fluid mechanics: fluid properties, Bernoulli and continuity, pipe friction and minor losses, pump and fan affinity laws.
IV. Mechanical design and components 10. GD&T symbol glossary, ISO and ASME fits, surface finish. 11. Fasteners and seals: metric and unified threads, property classes, keys and splines, O-ring sizes. 12. Power transmission: gears, bearings and L10 life, belts and chains. 13. Vibration and noise: natural frequency, damping, decibel reference.
Appendix: reference tables and charts A. Pipe and tubing standards. B. Beam and structural shapes. C. Hardness conversion. D. Temperature equivalents. E. ISO tolerance grades.
Free tools you can use today. While the book is being written.Free tools you can use today. While the book is being written.
Free tools you can use while the book is being written.

Is there a table or formula you always have to look up? Tell me.

Share this engineering resource

Recommend this handbook to colleagues.